You are not logged in or registered. Please login or register to use the full functionality of this board...


Newell House

i have been chuckling about jimmys "throw in rebar" comment. they dont throw in rebar unless you throw them money....

ha

2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

(08-06-2015, 10:07 AM)encantotom Wrote:  i have been chuckling about jimmys "throw in rebar" comment.   they dont throw in rebar unless you throw them money....

ha

I always wanted to build bridges... (:-)

Jimmy
Reply

the concrete trucks kinda showed up at 7.  meaning the piratemobile had to go guide them to our house....ha

it looks great.  the picture with the small retaining wall are the rv cleanouts.  since they were inset into the slope i thought this would be a cool idea.  it turned out great.  i will cut the pipes down and put pavers inside the area so it can drain.  

they just drove off...it is 11am.  

tom


Attached Files Thumbnail(s)
           

2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

an update. now that the weather is cooling down, i am alot more motivated to work....ha

now have 175 tons of 1/4 minus granite in piles around the shop and another 100 tons or so to come this week.

i have been working on the ductwork for the hvac. doug has helped me as i struggled through the design.

i hope to have it done in the next week or so. kinda slow doing it by myself.

the remainder of the wiring should be done in a week or so as well.

then insulation which i will do. (all of this is the mancave)

so, with any luck, i should be ready for drywall for the rest of the shop and the mancave in a couple of weeks.

then the floor coating, then the finish work in the mancave....installation of kitchen, bathroom, etc.

tom

2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

an update.  

after spending the last month doing the final wiring and low voltage, insulation, and hvac ductwork, i finally got it drywalled last weekend.  2 guys hung all the rest (about 4500 sq foot of drywall) on saturday.  they were fast.  and i had a ton of outlets, switches and ceiling lights.  

should be taped, textured and painted over the next ten days or so.  

then the shower will get tiled, then the floor coating done where i am doing it.  

then time to assemble the mancave, appliances, kitchen, compressor air lines etc.  

also having a 500 sq foot paver patio put down by the gazebo with seating so i can put a hot tub out there.  

things are moving along.  

tom


Attached Files Thumbnail(s)
                       


2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

Would you like me to pop over and splatter some paint thinner from a dirty brush, grinding dust from a side grinder on a rusty muffler, and a little used oil from a diesel on the drywall? Just to break it in of course.

Richard and Rhonda Entrekin
99 Newell, 512
Maverick Hybrid Toad
Inverness, FL (when we're home Cool )
Reply

A Rotary lift.....Kool. I have a 4 post Rotary, built in Indiana!

1993 Newell (316) 45' 8V92,towing an Imperial open trailer or RnR custom built enclosed trailer. FMCA#232958 '67 Airstream Overlander 27' '67GTO,'76TransAm,'52Chevy panel, 2000 Corvette "Lingenfelter"modified, '23 Grand Cherokee.
Reply

Tom, awesome facility! Are you doing this to make me break one of the ten commandments, "Thou shall not covet"?

Jon & Chris Everton
1986 40' Dog House #86
450 hp ISM 5 spd ZF Ecomat 2
2004 Range Rover L322 Toad
Reply

That is an amazing facility. You will never have to go into the house.
Very cool.

Peter Haggins
Courtenay BC
Canada
96 Wanderlodge 42' Mid Door
Reply

There's going to be a hot tub?


Clarke and Elaine Hockwald
1982 Newell Classic, 36', 6V92 TA
2001 VW Beetle Turbo
Cannondale Tandem
Cannondale Bad Boy
Haibike SDURO MTB
http://whatsnewell.blogspot.com
Reply


Forum Jump:


Users browsing this thread: 17 Guest(s)