Posts: 5,751
Threads: 493
Joined: Jul 2012
Progress on the shop has been at a standstill. first waiting for trusses, then a week of torrential rains. thought the framers would be back today, but have not seen them yet.
hopefully the trusses are done and waiting.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH
Posts: 829
Threads: 75
Joined: Jul 2012
Tom ...They may have re-purposed them to the ARK......
Jimmy
Posts: 5,751
Threads: 493
Joined: Jul 2012
talked to the builder and he said they are waiting for the trusses.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH
Posts: 829
Threads: 75
Joined: Jul 2012
Yep out of Gopher-wood... I remember the first year in my new house it rained like that... Identified all the areas I needed Dry Rivers and French Drains... You should have clear sailing after this Tom... and it will be cool enough to work in your new diggs!
Jimmy
Posts: 1,696
Threads: 123
Joined: Aug 2012
Interesting...We get the trusses first and make sure they and the footer dimensions agree.
1993 Newell (316) 45' 8V92,towing an Imperial open trailer or RnR custom built enclosed trailer. FMCA#232958 '67 Airstream Overlander 27' '67GTO,'76TransAm,'52Chevy panel, 2000 Corvette "Lingenfelter"modified, '23 Grand Cherokee.
Posts: 5,751
Threads: 493
Joined: Jul 2012
since my trusses are so large, he wanted to pour the concrete, then measure off of that and that is what they did.
got me is the real answer
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH
Posts: 49
Threads: 2
Joined: Aug 2014
if you are going to put overhead lighting in make sure the lighting is not directly over the center of the MH but down each side of the coach, so you will have good lighting on both side and top of the coach. Looks great and know you will enjoy it.
Ed and Penny Thomas
Anna, TX
98 Newell
coach #490
Posts: 5,751
Threads: 493
Joined: Jul 2012
the lighting is designed and laid out to have rows of lights on each side of the coach and the same if there was a coach in the second bay. and one light over the end where the engine bay is.
then over the area where the lift would be. in addition, there are 4 high cfm ceiling fans that are not in the way of the lights.
i had a lighting engineer do the foot candle calcs. it is at 105 foot candles at 3 foot heigh. which they consider working height. that is about just over 1000 lumens.
you can see from the link below that it is right in the range of what a walmart supercenter would be at.
http://relightdepot.com/news/lighting-10...do-i-need/
i am putting in what i think to be a ton of lights. gonna really run the power bill up. but i am switching them on quite a few different switches so i can control what i have on at a time.
great advice though. i am open to advice on anything.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH
Posts: 5,751
Threads: 493
Joined: Jul 2012
Posts: 1,479
Threads: 98
Joined: Jul 2012
In a work - fascinating. But how did they unload them?
2001 Newell #579
tow a Honda Odyssey
fun car: 1935 Mercedes 500K replica