07-24-2023, 07:41 AM
Yesterday I had some time to start actual final battery installation!
All batteries have been top balanced to 3.64V and left hooked in parallel for about a week.
I got to where all batteries installed and switches with fuses wired up to the coach.
When I find some time actual battery wiring can be finalized.
All batteries have been top balanced to 3.64V and left hooked in parallel for about a week.
I got to where all batteries installed and switches with fuses wired up to the coach.
When I find some time actual battery wiring can be finalized.