03-11-2021, 03:27 PM
Just finished a satisfactory fix. Desiring a direct mechanical solution, I made my own toggle bolts to support the nine puck lights, which in turn support the ceiling. Drilled through each fixture and assembled hangers as shown in the pix. Before drawing the assembly up to original height, added 3M VHB tape to all accessible gaps around the sagging plexi. After the fixtures were all up tight, the gap at the edge was less than 1/2” and the double stick tape held easily.
2001 #579 ("Chester's Coach")