08-12-2020, 06:43 AM
UPDATE:
After several months of too many projects going at one time I can say COMPLETE!! Control panel redone on dash! AH rebuilt! Headhunter installed and water bay fixed and the shower complete change out of all shower internals! Front brake assembly removed, all air leaks around brake fixed and installed back in! New accumulator tank!
Finally everything is working! AH completely redone, new parts, wiring and so on. I can report that out of the shower and sink after 45 minutes both were still maintaining 112 degrees!! I am one happy lady! I can now take a nice Hot shower and will not run out of hot water!!
Pam
After several months of too many projects going at one time I can say COMPLETE!! Control panel redone on dash! AH rebuilt! Headhunter installed and water bay fixed and the shower complete change out of all shower internals! Front brake assembly removed, all air leaks around brake fixed and installed back in! New accumulator tank!
Finally everything is working! AH completely redone, new parts, wiring and so on. I can report that out of the shower and sink after 45 minutes both were still maintaining 112 degrees!! I am one happy lady! I can now take a nice Hot shower and will not run out of hot water!!
Pam
Jeff and Pam Reganall
1996 45' Newell Coach #432 Series 60, Allison 6 Speed
Towing 2012 3/4T Ram Truck loaded with the RZR XP Turbo