09-09-2019, 04:01 PM
I saw the thread and read it completely. I did make contact with Boyd's Welding in Ocala, FL where they specialize in Alum tanks They have a six to ten week lead time on a new tank. I am going to make up a very detailed drawing and get a quote if I ever need to do this again.
Inspecting the bottom where the tank rested on the plywood there was some surface rust that may have penatrated say 10% of the metal thickness....no leaks in that area at all. The main leak was at the welded seem which will be taken care of at the tank shop. Going to clean up the rust and coat the exterior bottom with POR15 as well.
Steve
Inspecting the bottom where the tank rested on the plywood there was some surface rust that may have penatrated say 10% of the metal thickness....no leaks in that area at all. The main leak was at the welded seem which will be taken care of at the tank shop. Going to clean up the rust and coat the exterior bottom with POR15 as well.
Steve
Steve & Doris Denton
45' Newell #525, Bath & Half....sold
37' Country Coach, Tribute....Cat C9, 400 hp
2014 Honda CRV Toad
Summerfield, FL