01-03-2016, 09:59 PM
a few updated pictures and progress.
all electrical is done. i just finished trimming out the zillion outlets and switches and 50a receptacles. there are over 80 circuits in the shop. my electrician buddy said i was a little nutty on that but i have lots of control....
the drywall and painting is all done.
the shower is partially tiled and hopefully will be finished in a week or so.
i installed 18 can lights in the man cave after experimenting with lots of different wattages and color temps of LED lights. i like 5000k. yesterday darlene and i installed all the hvac ceiling vent louver covers. i put a NEST Protect smoke and CO detector in as well.
this week the rapidair aluminum airline system will arrive and i will get after installing that.
darlene and my daughter laura are designing the wall stripeing that will kinda matching the stripes on the newell.
i also need to finish putting the crushed granite around the shop. i have over 200 tons of it sitting in piles
i am working on the network, home theatre and tv cabling now as well. there will be a tv in front of the toilet (of course), one in the shop and one in the mancave. along with speakers out in the shop area.
still have alot to do. but....the hot tub was installed last week so it is ready and waiting for you all....
and.....sharknado struck in the shop over christmas. not sure how to get the flying sharks out of there.
tom
all electrical is done. i just finished trimming out the zillion outlets and switches and 50a receptacles. there are over 80 circuits in the shop. my electrician buddy said i was a little nutty on that but i have lots of control....
the drywall and painting is all done.
the shower is partially tiled and hopefully will be finished in a week or so.
i installed 18 can lights in the man cave after experimenting with lots of different wattages and color temps of LED lights. i like 5000k. yesterday darlene and i installed all the hvac ceiling vent louver covers. i put a NEST Protect smoke and CO detector in as well.
this week the rapidair aluminum airline system will arrive and i will get after installing that.
darlene and my daughter laura are designing the wall stripeing that will kinda matching the stripes on the newell.
i also need to finish putting the crushed granite around the shop. i have over 200 tons of it sitting in piles
i am working on the network, home theatre and tv cabling now as well. there will be a tv in front of the toilet (of course), one in the shop and one in the mancave. along with speakers out in the shop area.
still have alot to do. but....the hot tub was installed last week so it is ready and waiting for you all....
and.....sharknado struck in the shop over christmas. not sure how to get the flying sharks out of there.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH