an update.
after spending the last month doing the final wiring and low voltage, insulation, and hvac ductwork, i finally got it drywalled last weekend. 2 guys hung all the rest (about 4500 sq foot of drywall) on saturday. they were fast. and i had a ton of outlets, switches and ceiling lights.
should be taped, textured and painted over the next ten days or so.
then the shower will get tiled, then the floor coating done where i am doing it.
then time to assemble the mancave, appliances, kitchen, compressor air lines etc.
also having a 500 sq foot paver patio put down by the gazebo with seating so i can put a hot tub out there.
things are moving along.
tom
after spending the last month doing the final wiring and low voltage, insulation, and hvac ductwork, i finally got it drywalled last weekend. 2 guys hung all the rest (about 4500 sq foot of drywall) on saturday. they were fast. and i had a ton of outlets, switches and ceiling lights.
should be taped, textured and painted over the next ten days or so.
then the shower will get tiled, then the floor coating done where i am doing it.
then time to assemble the mancave, appliances, kitchen, compressor air lines etc.
also having a 500 sq foot paver patio put down by the gazebo with seating so i can put a hot tub out there.
things are moving along.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH