10-04-2015, 04:43 PM
an update. now that the weather is cooling down, i am alot more motivated to work....ha
now have 175 tons of 1/4 minus granite in piles around the shop and another 100 tons or so to come this week.
i have been working on the ductwork for the hvac. doug has helped me as i struggled through the design.
i hope to have it done in the next week or so. kinda slow doing it by myself.
the remainder of the wiring should be done in a week or so as well.
then insulation which i will do. (all of this is the mancave)
so, with any luck, i should be ready for drywall for the rest of the shop and the mancave in a couple of weeks.
then the floor coating, then the finish work in the mancave....installation of kitchen, bathroom, etc.
tom
now have 175 tons of 1/4 minus granite in piles around the shop and another 100 tons or so to come this week.
i have been working on the ductwork for the hvac. doug has helped me as i struggled through the design.
i hope to have it done in the next week or so. kinda slow doing it by myself.
the remainder of the wiring should be done in a week or so as well.
then insulation which i will do. (all of this is the mancave)
so, with any luck, i should be ready for drywall for the rest of the shop and the mancave in a couple of weeks.
then the floor coating, then the finish work in the mancave....installation of kitchen, bathroom, etc.
tom