08-05-2015, 12:06 PM
today they prepped for the concrete for the ramp and doors and pads
the concrete area in front of the garage doors is 36 wide and 35 long. that was as big as i could make it and still have room to drive around it
then a pad connecting to it for the front man door, a rear man door pad, a 4x4 pad under the rear hose bib so i can set a hose on it, a 12x5 under the 2 50a rv receptacles that runs and includes the aircon pad and under the next hose bib.
then i am doing a recessed stemwall around the rv cleanouts so they can be recessed into the raised area and be protected by concrete to prevent running over them. i will put pavers around the cleanouts to make an area that will drain.
tomorrow at 7am the concrete trucks come.
tom
the concrete area in front of the garage doors is 36 wide and 35 long. that was as big as i could make it and still have room to drive around it
then a pad connecting to it for the front man door, a rear man door pad, a 4x4 pad under the rear hose bib so i can set a hose on it, a 12x5 under the 2 50a rv receptacles that runs and includes the aircon pad and under the next hose bib.
then i am doing a recessed stemwall around the rv cleanouts so they can be recessed into the raised area and be protected by concrete to prevent running over them. i will put pavers around the cleanouts to make an area that will drain.
tomorrow at 7am the concrete trucks come.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH