12-20-2014, 08:19 PM
the floor was poured in the summer and is flat. i really wanted it flat. there are lots of crack control cuts that were done the day the floor was poured.
i am considering different options on the floor from nothing to commercial airplane hanger urethane.
richard, i am not a fan of the pegboard look for 160 linear feet (the one sidewall, backwall and half of the other side wall.
i had pegboard in my small workshop in mesa and didnt care for it.
i want something that i can hang things, on, be able to spray the floor down and not worry about the covering. i do have a 6" concrete stem before the drywall starts (and the bottom plate).
since my shop will be an extended living area of sorts, i want it to look cool too.
tom
i am considering different options on the floor from nothing to commercial airplane hanger urethane.
richard, i am not a fan of the pegboard look for 160 linear feet (the one sidewall, backwall and half of the other side wall.
i had pegboard in my small workshop in mesa and didnt care for it.
i want something that i can hang things, on, be able to spray the floor down and not worry about the covering. i do have a 6" concrete stem before the drywall starts (and the bottom plate).
since my shop will be an extended living area of sorts, i want it to look cool too.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH