11-24-2014, 05:11 PM
a couple more days of stucco prep. 2 sides are done and the other two sides are half done. it takes them a long time to move the scaffolding and the ground is not even where they put it.
i am guessing they will be done either tomorrow or wednesday with the lath.
the builder laid 350 feet of 2 1/2" conduit today as well.
our son scott is coming home for the week tomorrow and between he and i we should get my wiring work done inside this week.
next is stucco lath, plumbing and rough electrical inspection next week prior to insulation and drywall. once the drywall is up, then they will do the stucco scratch coat.
tom
i am guessing they will be done either tomorrow or wednesday with the lath.
the builder laid 350 feet of 2 1/2" conduit today as well.
our son scott is coming home for the week tomorrow and between he and i we should get my wiring work done inside this week.
next is stucco lath, plumbing and rough electrical inspection next week prior to insulation and drywall. once the drywall is up, then they will do the stucco scratch coat.
tom