11-20-2014, 01:30 PM
the last few days has been some activity. they loaded the roof with the tile yesterday, the kept working on the 300' or so of trenching for the electrical and the stucco guys are putting the black paper and 1" foam on the side of the shop with metal lath wire.
it is cool to see it taking shape.
there was quite a bit of hand digging that needed to be done. the smaller fellow was almost up to his shoulders in the narrow trench up by the building.
happy 4th saturday
tom
it is cool to see it taking shape.
there was quite a bit of hand digging that needed to be done. the smaller fellow was almost up to his shoulders in the narrow trench up by the building.
happy 4th saturday
tom