10-07-2014, 03:48 PM
a few more pictures from this afternoon. they were working on the facia for the roofline today as well. i will do pictures once they are done with that.
will start on electrical and plumbing next week.
i just sat out there this afternoon with a buddy for a while. it was only in the 80's today and overcast so a fantastic day.
the framed in room is the mancave that will be air conditioned. it is 16x32 with a 10 foot interior ceiling. to scale the picture, the top of the mancave is 11 feet tall. it is built strong enough for storage on top.
too bad they have to put a roof on it....the view is great.
tom
will start on electrical and plumbing next week.
i just sat out there this afternoon with a buddy for a while. it was only in the 80's today and overcast so a fantastic day.
the framed in room is the mancave that will be air conditioned. it is 16x32 with a 10 foot interior ceiling. to scale the picture, the top of the mancave is 11 feet tall. it is built strong enough for storage on top.
too bad they have to put a roof on it....the view is great.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH