10-01-2014, 10:25 PM
they have a lot of work to do yet before trusses. they are going to finish those up thursday and have the crane come on friday.
tonite as the afternoon was ending, darlene and i sat out in the shop with lawnchairs and enjoyed the cool breeze and just sat and looked around. we tweaked the location of the door and shower in the mancave.
my grand daughter katy and i picked up nails after dinner to get them off of the concrete so they dont grind them into the concrete.
the rv pad will be between the gazebo and the shop.
i ordered the ceiling light fixtures today and are closing in on what garage doors and openers to get.
soon i will be ready for visitors.....those that have a tool belt anyway.....ha
tom
tonite as the afternoon was ending, darlene and i sat out in the shop with lawnchairs and enjoyed the cool breeze and just sat and looked around. we tweaked the location of the door and shower in the mancave.
my grand daughter katy and i picked up nails after dinner to get them off of the concrete so they dont grind them into the concrete.
the rv pad will be between the gazebo and the shop.
i ordered the ceiling light fixtures today and are closing in on what garage doors and openers to get.
soon i will be ready for visitors.....those that have a tool belt anyway.....ha
tom