08-16-2014, 10:35 AM
Forest
No DVD or handout only verbal
Am having dinner with (JR) to nite who built Johnson Controls plant and will try and get you a one on one
$35K cost estimate was off the cuff response for retrofit not new bus as new bus cost will have cost of two inverters in price and they are dollar for dollar
They estimate battery cost at half industry standard or about $1K a KW hour
Alternator they use is the same one they use in 2 MW Wind turbines and is about the size of the one on my suburban
Engineer suggested you could put two of these systems in for 66k watts of power
They also are suggesting you could cut generator size in half
They ran this Marathon with 3 A/C running full blast, "5" refrigerators, and everything else going for 6 hours before they needed to recharge
No DVD or handout only verbal
Am having dinner with (JR) to nite who built Johnson Controls plant and will try and get you a one on one
$35K cost estimate was off the cuff response for retrofit not new bus as new bus cost will have cost of two inverters in price and they are dollar for dollar
They estimate battery cost at half industry standard or about $1K a KW hour
Alternator they use is the same one they use in 2 MW Wind turbines and is about the size of the one on my suburban
Engineer suggested you could put two of these systems in for 66k watts of power
They also are suggesting you could cut generator size in half
They ran this Marathon with 3 A/C running full blast, "5" refrigerators, and everything else going for 6 hours before they needed to recharge