today there was a crew of ten concrete guys. they changed from a separate footer, stem and floor pour to a monolithic pour. the plumber was there to lay out the underground plumbing.
it will be dug and plumbed in the next 2 days and then once they have that done and they have the dimensions for the sill bolts/rods, they will do the pour. gee, maybe this week who knows.
i attached a few pictures that gave a little better perspective on the dimensions. had darlene stand in the back corner with her arms outstretched.
happy 1st saturday
tom
it will be dug and plumbed in the next 2 days and then once they have that done and they have the dimensions for the sill bolts/rods, they will do the pour. gee, maybe this week who knows.
i attached a few pictures that gave a little better perspective on the dimensions. had darlene stand in the back corner with her arms outstretched.
happy 1st saturday
tom