08-05-2014, 09:33 PM
8/5
the concrete guys were here today and laid out the shop and tomorrow the backhoe will be here to dig the footers.
exciting time to see things getting done.
darlene and i were in bathroom simulation mode.....i know it sounds weird. we did cutouts and were laying out how we wanted the bathroom to be rough plumbed once the stem walls are done.
will be a compact, but not too small bathroom that is 6x11. sink, toilet, urinal and shower.
been talking to concrete coating companies and am trying to decide what to do with the floor once the construction is done. was pretty impressed with a guy i talked to who specializes in airplane hangers and commercial buildings.
it is beginning to feel real now.
tom
the concrete guys were here today and laid out the shop and tomorrow the backhoe will be here to dig the footers.
exciting time to see things getting done.
darlene and i were in bathroom simulation mode.....i know it sounds weird. we did cutouts and were laying out how we wanted the bathroom to be rough plumbed once the stem walls are done.
will be a compact, but not too small bathroom that is 6x11. sink, toilet, urinal and shower.
been talking to concrete coating companies and am trying to decide what to do with the floor once the construction is done. was pretty impressed with a guy i talked to who specializes in airplane hangers and commercial buildings.
it is beginning to feel real now.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH