07-25-2014, 06:39 PM
day 3 of grading and building the pad. this shot shows what 25-30 ten yard dump trucks of dirt looks like spread around. and another 10-20 to go.
the front part needed to be raised 20" for the pad and going down to 10" at the back where the ground was higher. then ten more inches on top of that for concrete and abc rock.
it is finally starting to look like a building pad
i felt bad for the guys. it has been 110 plus the last few days and in the afternoon that sun was brutal beating down on the guys.
tom
the front part needed to be raised 20" for the pad and going down to 10" at the back where the ground was higher. then ten more inches on top of that for concrete and abc rock.
it is finally starting to look like a building pad
i felt bad for the guys. it has been 110 plus the last few days and in the afternoon that sun was brutal beating down on the guys.
tom