06-20-2014, 07:27 PM
Update on my Shop,
after 5 months of drawing, engineering, surveying and the last 3 months of permitting, today i got my building permit to start construction.
i never expected it would take 3 months to get the permit.
next week they should start building up the pad. they have to raise it up about 18" or so. thats a lot of dirt.
it almost seems surreal after waiting so long and talking about it so much.
i keep trying to imagine how it will really look and it will be fun to see if what i have seen in my mind for so long is what it really looks like.
if people are interested, i will put updates and pictures as construction progresses.
i am feeling a bit lowly as you all are gathering in table rock. sure wishing we could have made it.
tom
after 5 months of drawing, engineering, surveying and the last 3 months of permitting, today i got my building permit to start construction.
i never expected it would take 3 months to get the permit.
next week they should start building up the pad. they have to raise it up about 18" or so. thats a lot of dirt.
it almost seems surreal after waiting so long and talking about it so much.
i keep trying to imagine how it will really look and it will be fun to see if what i have seen in my mind for so long is what it really looks like.
if people are interested, i will put updates and pictures as construction progresses.
i am feeling a bit lowly as you all are gathering in table rock. sure wishing we could have made it.
tom
2002 45'8" Newell Coach 608 Series 60 DDEC4/Allison World 6 Speed HD4000MH