02-28-2014, 09:26 PM
Todd
I believe your assumption is correct. The engine and transmission are installed prior to the upper structure being built. I believe the lower chassis and deck are constructed and the the slide areas followed by the wall and ceiling structure and end chaos. It spears the siding is placed both exterior and interior and then foamed. Hard not being close to go watch this on a regular basis.
Doug and Melanie Matz
2015 45 Bunk Coach 1517
Toad Ford Flex