Newell House

a couple more days of stucco prep. 2 sides are done and the other two sides are half done. it takes them a long time to move the scaffolding and the ground is not even where they put it.

i am guessing they will be done either tomorrow or wednesday with the lath.

the builder laid 350 feet of 2 1/2" conduit today as well.

our son scott is coming home for the week tomorrow and between he and i we should get my wiring work done inside this week.

next is stucco lath, plumbing and rough electrical inspection next week prior to insulation and drywall. once the drywall is up, then they will do the stucco scratch coat.

tom


Attached Files Thumbnail(s)
                       


2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

btw, the rv pad will be on the side that has the ramada in front of it.

tom

2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

Oh my gosh that building is huge. It's going to be awesome. You're never going to be in your house anymore. You will need some sort of two way radio so your wife can check in on you from the house Tom!

Todd & Dawn Flickema
Former owners of a Classic 1984 Newell
71 Karmann Ghia
Sioux Falls, South Dakota
Reply

Maybe put in one of those vacuum tube things the banks use. Then you can send Missy back and forth with a message.

Forest & Cindy Olivier
1987 log cabin
2011 Roadtrek C210P
PO 1999 Foretravel 36'
1998 Newell 45' #486 

1993 Newell 39' #337 
Reply

We'll be there in about 8 weeks......looking forward to seeing the finished product....or nearly finished product.


Clarke and Elaine Hockwald
1982 Newell Classic, 36', 6V92 TA
2001 VW Beetle Turbo
Cannondale Tandem
Cannondale Bad Boy
Haibike SDURO MTB
http://whatsnewell.blogspot.com
Reply

nearly is the right word. it wont be done. should be done with the initial build, then have to work on the inside. and grading outside

tom

2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

I'm first in line to tear something greasy apart and christen the floor.

Richard and Rhonda Entrekin
99 Newell, 512
Maverick Hybrid Toad
Inverness, FL (when we're home Cool )
Reply

stucco preparation is completed. foam, wire, caulking etc.

power company inspected the trench for the 200a service and approved it.

it is so stark white with the white foam that it almost glows...

tom


Attached Files Thumbnail(s)
   

2002 45'8" Newell Coach 608  Series 60 DDEC4/Allison World 6 Speed HD4000MH

Reply

Yep!! Should be visible to the "Space Lab"!! Looking Good!!

Jimmy
Reply

Wow! We built a 36x50 barn, level reinforced, 4" concrete floor, 24' high at peak, but never got the Newell inside as it was built before we got the coach. The big barn doors were on one side, not front or back so even the Allegro Bus, prior coach to Newell 729, wouldn't fit but the 36' Barth just fit sideways and cut the barn in half inside. Had to walk outside to get to front or back.
What I remember someone saying when we built it was that they never heard anyone say, "I built the barn (shop) too big."
So true. In fact, in it was the barn that sold the 6 acres and house last January and that's no joke. The guy who bought it put in second story, insulated and heated it, made it into a terrific shop and studio for his art work. He builds lamps!
Hope to visit this magnificent show place of yours, Tom, some day.

Gary and Susie
2005 47' Newell #729 4 slides DD 60 Allison 6 spd
2013 Ford F-150 3.5 crew cab, eco-boost twin turbo 4x4
2010 Ford Edge AWD
Black Labradoodle, "Dude"

http://nuevomexprimetime.blogspot.com
http://www.garyrgruber.blogspot.com
Reply


Forum Jump:


Users browsing this thread: 5 Guest(s)