04-11-2013, 02:13 AM
During the production tour, we were able to watch as their flooring guy was getting prepared to lay a rear bath granite floor in a new coach. On the floor of his shop he had a full size template of the rear bath for the coach the floor would eventually be installed in. He was assembling the floor, minus grouting, over the template exactly as it will be in the coach. Once he is finished assembling the floor over the template, he will install it in the coach at night after the other production crew has left. This is done so that the floor has time to dry, without losing any production time. Simply amazing how almost 50 years has tuned things so finely!
Steve Bare
1999 Newell 2 slide #531