You are not logged in or registered. Please login or register to use the full functionality of this board...
Newell Gurus
1517 Bunk Coach - Printable Version

+- Newell Gurus (https://newellgurus.com)
+-- Forum: General and or Other Stuff (https://newellgurus.com/forumdisplay.php?fid=16)
+--- Forum: Discussion about what to consider on buying a used Newell (https://newellgurus.com/forumdisplay.php?fid=80)
+--- Thread: 1517 Bunk Coach (/showthread.php?tid=1291)

Pages: 1 2 3 4 5 6 7


RE: 1517 Bunk Coach - HoosierDaddy - 03-05-2014

Is that OSB flooring? When did Newell start using that?


RE: 1517 Bunk Coach - Dmatz - 03-05-2014

Marc

Yes please send pics as often as possible. Thank you


RE: 1517 Bunk Coach - Dmatz - 03-05-2014

It appears the OSB board is place to protect the floor. Perhaps Marc can verify this on Thursday.


RE: 1517 Bunk Coach - Yachts - 03-05-2014

I'm not sure what sob floor is.. But I'll be up there at 10 in the morn. If you want to call me at 10 I can take as many pics of whatever you wantSmile


RE: 1517 Bunk Coach - Dmatz - 03-06-2014

Marc

Thanks for the pics they are great

   

   

   

Progress being made


RE: 1517 Bunk Coach - ccjohnson - 03-06-2014

That is a lot of wire!


RE: 1517 Bunk Coach - encantotom - 03-06-2014

for some reason i thought there was less wire in the new coaches with the multiplexed bus control systems. i realize power still needs to be surprised but there really is a LOT of wire there.

tom


RE: 1517 Bunk Coach - Ozarkguy - 03-06-2014

I was thinking the inverse. Considering the # of gizmos n lighting that will be installed, not that much. You should look at the Prevost!! I'm always amazed in that no matter how much the Newell changes it remains true to the origins and basic model. My ole' 74 was much the same. That's what I love about the Newell. Basic design and construction thru the ages. Just me I know, I always wonder, "How is it Made"! Not so much other stuff.

It's looking Great!!


RE: 1517 Bunk Coach - Dmatz - 03-10-2014

So I have spent many hours reviewing the lighting and switching for the coach. At many points during this time I felt like just leaving it the way Newell sent it, then I remember that we are building this and we have the choice so I can blame me when I don't like it. For what it's worth there are 185 switches not including items not on the Spyder system inside, some 25 or more outside. I am not complaining just sharing.


RE: 1517 Bunk Coach - Fulltiming - 03-10-2014

The degree of complexity of the new coaches compared to ones built 15-25 years ago is absolutely amazing. I can just imagine what the wiring spaghetti would look like without the multiplex Spyder system.